Beam Span Calculator

Look up built-up header spans for #2 Southern Pine from the published IRC Table 602.7 supplement.

Loading calculator…

What this tool does

Look up built-up header spans for #2 Southern Pine from the published IRC Table 602.7 supplement. Scope: double (2-ply) headers of #2 Southern Pine, building widths 20/28/36 ft, ground snow 30/50/70 psf, two support cases. Other species use the multi-species IRC table values, which differ. This is a lookup, not a beam design.

How to use the Beam Span Calculator

  1. Enter or select built-up header / beam size (#2 southern pine).
  2. Enter or select what it supports.
  3. Enter or select building width.
  4. Enter or select ground snow load.
  5. Enter or select your opening / planned span in ft.
  6. Read the calculated result; change any measurement to compare alternatives.

Formula

table lookup in the published #2 Southern Pine supplement to IRC Table 602.7 (header spans by building width, ground snow load and supported load case)
size
Built-up header / beam size (#2 Southern Pine)
support
What it supports
bwidth
Building width
snow
Ground snow load
opening
Your opening / planned span (ft, before metric conversion)

Scope: double (2-ply) headers of #2 Southern Pine, building widths 20/28/36 ft, ground snow 30/50/70 psf, two support cases. Other species use the multi-species IRC table values, which differ. This is a lookup, not a beam design.

Worked example

For beam span calculator, the following measurements illustrate the exact method: Built-up header / beam size (#2 Southern Pine): 2-2x4; What it supports: roof; Building width: 20; Ground snow load: 30; Your opening / planned span: 5.

Inputs

  • Built-up header / beam size (#2 Southern Pine)2 – 2×4
  • What it supportsRoof and ceiling only
  • Building width20 ft
  • Ground snow load30 psf
  • Your opening / planned span5 ft

Result

  • Maximum header span3.25 ft
  • Maximum span3 ft 3 in
  • Your planned span5 ft
  • CheckOpening EXCEEDS the table span — upsize the header or add support

Double-header spans, 28 ft building, 50 psf snow (#2 SP)

HeaderRoof + ceilingRoof + ceiling + 1 floor
2 – 2x42 ft 5 in2 ft 2 in
2 – 2x63 ft 7 in3 ft 3 in
2 – 2x84 ft 5 in4 ft 0 in
2 – 2x105 ft 1 in4 ft 7 in
2 – 2x125 ft 8 in5 ft 2 in

Results explained

Maximum header span
Maximum header span from the formula above, expressed in ft before metric conversion. Scope: double (2-ply) headers of #2 Southern Pine, building widths 20/28/36 ft, ground snow 30/50/70 psf, two support cases. Other species use the multi-species IRC table values, which differ. This is a lookup, not a beam design.
Maximum span
Maximum span from the formula above. Scope: double (2-ply) headers of #2 Southern Pine, building widths 20/28/36 ft, ground snow 30/50/70 psf, two support cases. Other species use the multi-species IRC table values, which differ. This is a lookup, not a beam design.
Your planned span
Your planned span from the formula above, expressed in ft before metric conversion. Scope: double (2-ply) headers of #2 Southern Pine, building widths 20/28/36 ft, ground snow 30/50/70 psf, two support cases. Other species use the multi-species IRC table values, which differ. This is a lookup, not a beam design.
Check
Check from the formula above. Scope: double (2-ply) headers of #2 Southern Pine, building widths 20/28/36 ft, ground snow 30/50/70 psf, two support cases. Other species use the multi-species IRC table values, which differ. This is a lookup, not a beam design.

Frequently asked questions

For a 28 ft wide building, 50 psf ground snow, supporting roof and ceiling only: 5 ft 1 in. Add a centre-bearing floor and it drops to 4 ft 7 in (IRC Table 602.7 supplement, #2 Southern Pine).

A wider building puts more roof (and floor) area on the exterior wall — the header carries a wider tributary strip, so its allowed span shrinks.

Jack studs carry the header ends down to the plate. The full IRC table specifies their number for every cell (1–3 here); the lookup flags that you must take the count from the table for your cell.

No. This is the sawn-lumber header table only. Girders use IRC Table 602.7(2), and engineered beams (LVL, glulam, steel) follow the manufacturer's span tables.

Options: a 3- or 4-ply header (also in Table 602.7), an engineered beam, or a mid-span post. All need the full table or an engineer — do not extrapolate.